The fourth green is now open for play once again. But that’s not all—drainage has been installed around the first green, and turf will be laid shortly. Captain Sidetrack deserves special credit for proposing the use of plastic sheeting to facilitate the easy installation of pebbles, ensuring the stability of drainage pipes. Thanks to a generous donation from the STAGS, the bunkers on the fifth and sixth holes will also soon be back in play.
Things are going at a pace, if you feel you are able to give a hand to any of the projects that are currently underway please have a chat with Rob or Tom.